BlackWater Industries

BlackWater IndustriesBlackWater IndustriesBlackWater Industries
  • Home
  • Services
  • Projects
  • Contact Us
    • Home
    • Services
    • Projects
    • Contact Us

BlackWater Industries

BlackWater IndustriesBlackWater IndustriesBlackWater Industries

  • Home
  • Services
  • Projects
  • Contact Us

BlackWater EPC

image11

Highlighted Projects

image12

Palmer Distribution - Catalyst Handling Facility

The Palmer Distribution - Catalyst Handling Facility is a unique system that aids in the removal of waste catalyst from catalyst transport vessels. This project consisted of a Facility Air System, Facility Nitrogen Purge System, Catalyst Waste System, Facility Hydro Testing System, and Catalyst Filtration System.  

image13

MDI - Rail Car to Drum Line

The MDI - Rail Car to Drum Line was another one of Blackwater EPC's successful projects. This consisted of moving MDI from rail to drum via a pressurized system and filtration process. The project included a Rail Air System, Filtration Skid, Drum Line Equipment, Nitrogen Assist System, Rail Arm & Piping throughout the facility, Vapor Recovery System, Scale System, Drum Roller Table & Conveyor System. 

image14

Camp Allen WWTP Expansion

The Camp Allen Wastewater Treatment Plant Expansion Project consisted of a full plant expansion to double the Camps WWT capabilities. Full Engineering, Fabrication of Diffuser, Clarifier, Chlorine Contact Chamber, Plant Air Blower System, Electrical System, Influent & Effluent Lines, Bypass System, Complete Plant Construction.

Photo Gallery


Copyright © 2021 Blackwater EPC - All Rights Reserved.


Powered by GoDaddy